12 ideas (perceptions) were proposed. They all are good, but some of them are blockers to the rest of the ideas' effectiveness.
The main blocker is the perception that received the highest score:
RECOGNISE ENGINEERING SOLUTIONS
Med rank - two perceptions:
SUPPORT THEIR IDEAS IF AGREED
ALLOW TO RUN AND MANAGE PROJECTS
Elaborate a clever system to recognize professional engineering work.
In response to the potential outbreak of a third world war and the risk of Egypt becoming isolated from global trade and financial systems, this project aims to develop a self-sustaining, decentralized digital ecosystem. The goal is to ensure economic stability, resource accessibility, and secure communication for citizens, businesses, and the government in times of crisis. This solution will be delivered as an application-based platform that integrates barter trade, digital currency, AI-driven supply chain management, emergency communication, and cybersecurity measures. By leveraging blockchain technology, AI-powered logistics, and decentralized networking, the platform will enable uninterrupted trade, resource distribution, and crisis coordination without reliance on external financial institutions or internet-based infrastructure.
The integration of CFRP materials into automotive designs presents challenges related to compatibility, performance, and safety, necessitating a careful transition from a Chromolly tubular space frame to a CFRP monocoque. Key considerations include determining the optimal geometry for suspension, aerodynamic features, and the placement of components like the battery pack and sensors, all while adhering to FSAE safety protocols. Additionally, decisions regarding the production method—whether to use preimpregnated carbon fibers or an injection method—must be made early to facilitate timely production. The development process involves creating molds and plugs from suitable materials, ensuring that all assemblies can be connected without compromising structural integrity, and maintaining strict adherence to budget constraints and sourcing of materials.
An example of how to make task prioritization with Urgency - Important Matrix (UMI) using the PRIZ Innovation Platform