Collect perceptions on "What should be done to prevent engineers turnover at the plant?"
Use PMap tool
The process:
Assignation | Collector | Loop | Conflicts | Sum | Blocking Rank |
---|---|---|---|---|---|
E | 3 | 4 | 0 | 7 | high |
G | 1 | 4 | 0 | 5 | med |
C | 0 | 4 | 0 | 4 | med |
A | 0 | 0 | 3 | 3 | med |
L | 0 | 0 | 3 | 3 | med |
J | 1 | 0 | 0 | 1 | low |
B | 0 | 0 | 0 | 0 | low |
D | 0 | 0 | 0 | 0 | low |
F | 0 | 0 | 0 | 0 | low |
H | 0 | 0 | 0 | 0 | low |
I | 0 | 0 | 0 | 0 | low |
K | 0 | 0 | 0 | 0 | low |
Totaly 12 perceptions were generated for avoiding or, at least reducing, turnover of good engineers at the plant
The main purpose of the PMap investigation was to define the main blockers - perceptions that may block or resist the effects of the rest of the perceptions.
The main blocker is the perception that received the highest score:
RECOGNISE ENGINEERING SOLUTIONS
Med rank - two perceptions:
SUPPORT THEIR IDEAS IF AGREED
ALLOW TO RUN AND MANAGE PROJECTS
All these tree perceptions are blocking the effectiveness of the rest of the perceptions. These three blockers should be removed first.
Actually, all tree blocking perceptions are related one to another and their meaning is that engineers are satisfied when they can act as engineers and their engineering success is recognized.
Start a project on how to create a clever system to recognize professional engineering work.
An example of how to make task prioritization with Urgency - Important Matrix (UMI) using the PRIZ Innovation Platform